The list of free industrial platforms of the enterprises of the city of Chelyabinsk for the organization of business (Brownfield)

List of free industrial platforms of the enterprises of the city of Chelyabinsk for the organization of business  (Brownfield), as of 10.07.2016

 

№ 
p/p

Name of indicators

Info

JSC "Chelyabinsk plant of technological equipment»

1.

Location of the plot

Chelyabinsk,

Kopejskoe shosse, 5 p

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1176652, 61.5401141, Dornier Flugzeugwerke company under

2.

Cadastral numbers,

including (on):

-Office premises;

-industrial premises;

-warehouses

 

 

74-74-01/163/2012-152

74-74-01/165/2012-171

74-74-01/165/2012-171

3.

Form of ownership

private property

4.

Potential use of plot

manufacturing, administrative, warehouse

5.

The proposed use (rent, sale)

Rent

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

1.1

6.2.

Free real estate (buildings), only 880 sq ft*,

including (on giving the technical specifications of the building):

-Office premises;

-industrial premises;

-warehouses

 

 

 

 

550

300

30

7.

The distance to the border, km *:

-the nearest locality

 

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

420

-Ekaterinburg,

210

-Moscow

1800

8.

Distance to railway station, km *

1

9.

Distance to the highway, km *

0.3

10.

Distance to the nearest airport, km *

28

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes, Idgc Of Urals

-power, Mw *

4

-distance to the point of connection, km *

-

11.2.

 

 

The presence of gas networks:

Yes, Oao Novatek

-power, thousand cubic meters *

86.655

-distance to connect, km *

-

11.3.

The presence of water distribution networks:

Yes, CBM POVV

-capacity, m3/hour *

4

-distance to connect, km *

-

11.4.

Sewerage networks:

Yes, CBM POVV

-capacity, m3/hour *

4

-distance to the point of (accession) connections, km *

-

11.5

The existence of networks of heat supply:

-

 

-power, KWT *

-

 

-distance to connect, km *

-

12.

Champion:

 

Director of FOREIGN TRADE DEPARTMENT

Gurevich Anton Dmytrovych,

Tel. 8-909-090-56-58,

e-mail: gurevitch-ad@chzto74.ru

FSUE Plant "Pribor"

1.

Location of the plot

Chelyabinsk,

Komsomolsky Ave. 29

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1924075, 61.3594701, Dornier Flugzeugwerke company under

2.

Cadastral numbers,

including (on):

-administrative building-1;

-administrative building-2;

-administrative building-3;

-industrial building-2;

-mechanical chassis

 

 

74:36:07.10.003:0019:032607:1000/A3a3

74:36:07.10.003:0019:032607:1000/A4a4

74:36:07.10.003:0019:032607:1000/A5

74:36:07.10.003:0019:032607:1000/A6a6

74:36:07.10.003:0019:032607:1000/A7a7

3.

Form of ownership

Federal

4.

Potential use of plot

Manufacturing, administrative, storage, domestic

5.

The proposed use (rent, sale)

 

Rent

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

-

6.2.

Free real estate (buildings), total 14935.3 m2. m,

including (on giving the technical specifications of the building):

-administrative building-1;

-administrative building-2;

-administrative building-3;

-industrial building-2;

-mechanical chassis

 

 

 

 

585.5

209.7

1391.2

7500.6

5248.3

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

390

-Ekaterinburg,

196

-Moscow

1783

8.

Distance to railway station, km *

7

9.

Distance to the highway, km *

0.05

10.

Distance to the nearest airport, km *

20

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes

-power, Mw *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

200

200

200

600

400

-distance to the point of connection, km *

-

11.2.

The presence of gas networks:

No

-capacity, m3/hour *

-

-distance to the point of connection, km *

-


11.3.

 

 

 

 

 

 

 

 

The presence of water distribution networks:

Yes

-capacity, m3/hour *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

250

300

250

300

300

-distance to connect, km *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

25

25

30

30

35

-free power cube. m/h,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

100

150

100

100

100

11.4.

Sewerage networks:

Yes

-capacity, m3/hour*,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

300

400

200

350

350

-distance to the point of (accession) connections, km *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

 

25

25

30

30

35

11.5

The existence of networks of heat supply:

-

 

-power, KWT *

-

 

-distance to connect, km *

-

12.

Champion:

 

Zam. Chief Engineer 
Shamin Mikhail Sergeevich, 
Tel. (8-351) 741-83-02,

+7 -951 -775 -60 -30,

email: pribor@priborplant.ru

JSC Chelyabinsk automechanical plant "

1.

Location of the plot

Chelyabinsk,

str. Christmas, 13

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1554496, 61.4447463, Dornier Flugzeugwerke company under

2.

Cadastral number (on):

-manufacturing building # 2

(the letters "b-1);

-covered parking (span diesel valves) (the letters "b-2");

-truck Depot

 

74:36:00.00.00:040596:1000/B1

 

74:36:02.11.002:0017:040596:

1000/B2

74:36:00.00.00.00.040596:1000H

3.

Form of ownership

Private

4.

Potential use of plot

Administrative, warehouse

5.

The proposed use (rent, sale)

Rent, sale, joint activities

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

-

6.2.

Free real estate (buildings), total 11033 sq ft *,

including (on giving the technical specifications of the building):

-manufacturing building # 2 (letter b-1);

-covered parking (span diesel valves) (the letters "b-2");

-truck Depot

 

 

 

 

8000

 

2380

 

653

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

417

-Ekaterinburg,

200

-Moscow

1770

8.

Distance to railway station, km *

6

9.

Distance to the highway, km *

-

10.

Distance to the nearest airport, km *

20

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks

Yes, a private substation

-power, Mw *

18.4

-distance to the point of connection, km *

3.4


11.2.

 

 

 

 

 

The presence of gas networks:

 

Yes. Gas boiler house for their own needs (heating)

-capacity, m3/hour *

-

-distance to connect, km *

-

11.3.

The presence of water distribution networks:

Yes

-capacity, m3/hour *

6.25

-distance to connect, km *

0.25

11.4.

Sewerage networks:

Yes

-capacity, m3/hour *

6.25

-distance to the point of (accession) connections, km *

0.1

11.5

The existence of networks of heat supply:

-

 

-power, KWT *

-

 

-distance to connect, km *

-

12.

Champion

 

The Deputy Head of the Legal Department 
Glushkov, Tatyana Vasilevna

Tel. (8-351) 775-01-93,

email: chamz@chel.surnet.ru

Technopark Traktorozavodskij»

Industrial Park "Technics"

I. the portion of the EI part of warehouse when the UCS base SFM, CPF

1.

Location of the plot

Chelyabinsk, Lenina Ave., 3

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1545025, 61.4848828, 483m/data =! 3m1! 1e3https://www.google.ru/maps/@ 55.1571339, 61.4735901, 485m/data =! 3m1! 1e3

2.

Cadastral numbers, (on):

Press and welding-hull;

 

74:36:0211002:198,

-machine-Assembly building No. 1

74:36:0211002:192

-warehouse building in the UCS

74:36:0211003:241

-non-residential premises no. 1-part "building (workshop block cutting tool)"

74:36:0211003:258

-non-residential building (Woodshop with ABK)

74:36:0211003:107

3.

Form of ownership

Private

4.

Potential use of plot

Manufacturing, administrative, domestic

5.

The proposed use (rent, sale)

Rent, sale

6.

Total area, HA *

including:

214

6.1

Vacant land for industrial purposes, *

5.86

6.2.

Free real estate (buildings), total 313 361 sq ft *,

 

including (on):

Press and welding-hull;

141 205 sq.m. (it is possible to rent the space from 30000 to 50000 sq.m., hsr = 17.25 m; hoisting: bridge cranes with capacities from 1 up to 30 tons)

-machine-Assembly building No. 1

130 797 (possible to rent space from 30000 to 50000 sq.m., h > 10 m; hoisting: bridge cranes with capacities from 1 up to 15 tons)

-warehouse building in the UCS

7 946

-non-residential premises no. 1-part "building (workshop block cutting tool)"

21 859

-non-residential building (Woodshop with ABK)

11 554

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-UFA,

-

250

-Ekaterinburg,

180

-Moscow

1500

8.

Distance to railway station, km *

0

9.

Distance to the highway, km *

Close proximity

10.

Distance to the nearest airport, km *

17.5

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes

-power, Mw *

176

-distance to the point of connection,km *

Up to 1

-free power Mw

81

11.2.

The presence of gas networks:

City gas network

-capacity, m3/hour *

16 200

-distance to connect, km *

From 100 m up to 1 km, depending on the consumer

-free power cube. m/h

8000

11.3.

The presence of water distribution networks:

A fire drinking and industrial water

-capacity, m3/hour *

300

-distance to connect, km *

From 1 m to 100 m

-free power cube. m/h

160

11.4.

Sewerage networks:

Yes, prom. Storm and sewer flow

-capacity, m3/hour *

300

-distance to the point of (accession) connections, km *

From 100 to 500-prom. storm sewer;

from 50 to 200-flow drain

11.5

The existence of networks of heat supply:

Local heat supply

 

-power, KWT *

 

 

-distance to connect, km *

 


12.

Champion

 

The Chief of Department of development and investment Krivonosov, Alexey Vadimovich

Tel. (8-351) 778-47-97,

8-932-110-0000-08,

e-mail: krivonosov72 @ gmail. com

II. Chelyabinsk plant of tractor transmissions

1.

Location of the plot

Chelyabinsk,

Sverdlovsky Trakt, 38

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1992362, 61.3826187, 562m/data =! 3m1! 1e3

2.

Cadastral numbers, (on):

 

74:36:0706003:83; 74:36:0706003:1009; 74:36:0706003:111; 74:36:0706003:56; 74:36:0706003:54; 74:36:0706003:78; 74:36:0706003:55

3.

Form of ownership

Private

4.

Potential use of plot

Production

5.

The proposed use (rent, sale)

Rent, sale

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

-

6.2.

Free real estate (buildings), total 61459.5 sq ft *

including (on):

Non-residential premises # 2

 

 

Non-residential building (manufacturing building # 1)

 

 

 

 

Non-residential building (industrial building No. 3)

 

 

Non-residential building-built compressor

 

 

Non-residential building (building # 2)

 

 

 

Non-residential building is built (addition to CEC)

 

 

 

Non-residential building (store BBHO)

 

 

The building (warehouse paints CSF)

 

 

Non-residential building (item accounting for drinking water)

 

Non-residential building (finished products)

 

Non-residential building-outpost

 

Non-residential building (boiler room)

 

Non-residential building-warehouse rack

 

 

Non-residential building (building offices on the territory of the garage)

 

Non-residential building (built motor shop

 

Non-residential building is built (garage)

 

Non-residential building (building vulcanization)

 

Non-residential building (building welding shops)

 

Non-residential building (para. washing and sanitizing of cars)

 

Non-residential premises no. 1

 

Non-residential building-entrance of Office

 

Non-residential building (watch)

 

Non-residential building (warehouse-garage)

 

Non-residential building (dining at the industrial site)

 

Non-residential building (warehouse)

 

Construction (condensate pumping station)

 

Non-residential building (warehouse pol)

 

Non-residential building (substation No. 9 (RP-1))

 

Non-residential building (substation No. 48 (RP-2))

 

Non-residential building (substation No. 63 (SGP))

 

Construction (sewage pumping station)

 

Non-residential premises # 2 (1000002379)

 

 

 

2821.2 kV. m, 4 gates, height 10 m, crane 5 t and 3T-2 PCs., 1T-1 PCs.

 

40646.8 kV. m, 4 gates, height 13 m, lifting mechanisms: overhead travelling cranes 5-12 t-8 pieces, crane 5 t-12 PCs. 1 k-2 PCs., 0.5 t-2 PCs., 0.25 t-3 PCs

 

7968 sq.ft. m, 2 gates, the height of 13.5 m, overhead cranes 5T-6 PCs., 10 t-3 PCs.

 

1076.1 sq.ft. m, 2 gates, 7 m height crane-beam 1 t-1 PCs., crane 0.5 t-2 PCs.

 

10032.5 kV. m, 2 gates, 8.3 m height, hoisting: 3T-6 PCs., monorail-0.5 t.

 

522.6 sq.ft. m, 3-storey building built, gates, floor height 3.7; 3.9 m, crane-beam 0.25 t, monorail-1 t.

 

36.9 sq. m, height 3.5 m gates.

 

 

19.8 sq.m. m. (metal frame, covered with metal sheets)

 

5.5 sq m. m

 

 

1509.8 kV. m., 4 gates, 7.1 m height crane-beam k-3 PCs.

 

5.6 kV. m

 

909 sqm. m

 

975.1 square. m., 4 gates, height 6.9 m, crane-beam k-1 PCs.

 

297.6 sq.ft. m

 

 

230.6 sq.ft. m

 

 

2482.8 kV. m

 

 

103.7 q. m

 

 

537.6 sq.ft. m, 2-storey building

 

321.9 sq.ft. m

 

 

270 sq. m. m

 

53.8 sq. m

 

47.6 square. m

 

520.5 sq.ft. m

 

598.1 sq.ft. m, 2-storey building

 

 

33.8 square. m

 

40.2 sq. m

 

 

23.4 square. m

 

99.1 square. m

 

100.1 square. m

 

33 kV. m

 

30.4 square meters. m

 

881.1 sq.ft. m

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-UFA,

-

350

-Ekaterinburg,

180

-Moscow

1500

8.

Distance to railway station, km *

0.2

9.

Distance to the highway, km *

0.1

10.

Distance to the nearest airport, km *

13

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes

 

 

 

 

 

 

 

 

 

 

-power, Mw *

0.25 (2 transformer)

1 (23 transformer)

-distance to the point of connection, km *

-

11.2.

The presence of gas networks:

Yes, laying-on air and ground, medium and low pressure pipeline diameter-57-237 mm, presence of EMG.

 

 

 

 

 

 

 

 

 

 

 

-capacity, m3/hour *

-

-distance connections, km *

-

11.3.

The presence of water distribution networks:

Yes

 

 

 

 

 

 

 

 

 

 

 

-capacity, m3/hour *

-

-distance to connect, km *

-

-free power cube. m/h

-

11.4.

Sewerage networks:

Yes

 

 

 

 

 

 

 

 

Yes

 

-capacity, m3/hour *

-

-distance to the point of (accession) connections, km *

-

11.5

The existence of networks of heat supply:

Yes

 

 

 

 

 

 

 

 

 

 

-power, KWT *

-

 

-distance to connect, km *

-


12.

Champion

 

The Chief of Department of development and investment Krivonosov, Alexey Vadimovich

Tel. (8-351) 778-47-97,

8-932-110-0000-08,

e-mail: krivonosov72 @ gmail. com

OAO "chelyabinski Municipals plant" Teplopribor "

1.

Location

plot

Chelyabinsk,

str. 2 Paveletskaya str. 36

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.2745578, 61.4000652, 625 m/

2.

Cadastral number

74.36.01.170020007

3.

Form of ownership

Private

4.

Potential use of plot

Manufacturing, administrative, warehouse

5.

The proposed use (rent, sale)

Rent

6.

Total area, HA *

including:

11

6.1

Vacant land for industrial purposes, *

 

0.5

6.2.

Free real estate (buildings), sq ft *,

including:

 

 

 

 

 

 

Business premises (building # 1)

From 18 up to 500 sq.m.

Office rooms from 18 sq m in the business center class "b".

High-quality finishing (renovation), State-of-the-art glass, efficient floor plan.

There are 2 guarded parking 300 parking spaces. Operates 24 h security, canteen, shop, 2 ATM. For the convenience of tenants set up convenient places for smoking, opposite one of the buildings there is a relaxation area-garden stones.

Around the perimeter of the CCTV system has been installed, the system of access control.

 

Production and warehouse (building # 1)

100 sq ft

Heated production and warehouse

General information:

1) ceiling height 4.2 m;

2) concrete Floor;

3) free power 40 kW with increasing tenant upon request up to 200 kW;

4) Artificial and natural light (plastic Windows with double glazing);

6) ability to connect telephone lines and the Internet;

7) Gates 3.5 * 3.2 m.

 

Industrial premises (building No. 3)

From 50 to 500 sq.m.

Heated industrial premises

General information:

1) ceiling height from 7.23 to 11.33 m;

2) Smooth concrete floors;

3) Gates 4.0 * 4.4 m;

4) free capacity up to 500 kW on request of the tenant.

 

 

Industrial premises under manufacture (No. 13)

From 50 to 150 sq.m.

Heated premises under manufacture

General information:

1) Room is located on the 1 floor;

2) concrete floors;

3) separate entrance;

4) Power 50 kW;

5) 2.95 m height;

6) communications: sewerage, water (c/c).

 

Production and warehouse (building No 4)

155 sqm

Heated industrial premises

General information:

1) ceiling height 5.5 m;

2) concrete floors;

3) electric wire rope hoist is installed indoors with load capacity 3T;

4) the height of the Gate 3.5 * 3, 5 m.

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

433

-Ekaterinburg,

195

-Moscow

1772

8.

Distance to railway station, km *

On the territory of JSC "Chelyabinsk plant" Teplopribor "is a branch of the Southern-Ural railway station, the nearest station" Metallurgical "5 km

9.

Distance to the highway, km *

In the immediate vicinity

10.

Distance to the nearest airport, km *

13

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

LAP cable from JSC "Grid" 6 kW in property

-power, KWT *

2335

-distance to the point of connection, km *

0.37

11.2.

 

 

The presence of gas networks:

Gas supply network of OAO NOVATEK

Overhead method of laying;

Trunk of the second category;

Distribution of low pressure;

diameter of 100;

No FRACTURING

-capacity, m3/hour *

920

-distance to connect, km *

Passes through land

11.3.

The presence of water distribution networks:

POVV CBM (Jv "Vodosbyt")

Appointment of water distribution networks: domestic, fire, industrial

Diameter 100

-capacity, m3/day *

301

-distance to connect, km *

Passes through land


11.4.

Sewerage networks:

POVV CBM (Jv "Vodosbyt")

Appointment: rozdilna

-capacity, m3/day *

301

-distance to the point of connection, km *

Passes through land

11.5

The existence of networks of heat supply:

Heat supply network in stock

 

-power, KWT *

3600

 

-distance to connect, km *

Passes through land

12.

Champion

 

Marketing specialist property management division

Popova Marina Valerievna,

Tel. (8-351) 725-75-77,

e-mail: arenda@tpchel.ru

*-units of physical quantities

 

№ 
p/p

Name of indicators

Info

JSC "Chelyabinsk plant of technological equipment»

1.

Location of the plot

Chelyabinsk,

Kopejskoe shosse, 5 p

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1176652, 61.5401141, Dornier Flugzeugwerke company under

2.

Cadastral numbers,

including (on):

-Office premises;

-industrial premises;

-warehouses

 

 

74-74-01/163/2012-152

74-74-01/165/2012-171

74-74-01/165/2012-171

3.

Form of ownership

private property

4.

Potential use of plot

manufacturing, administrative, warehouse

5.

The proposed use (rent, sale)

Rent

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

1.1

6.2.

Free real estate (buildings), only 880 sq ft*,

including (on giving the technical specifications of the building):

-Office premises;

-industrial premises;

-warehouses

 

 

 

 

550

300

30

7.

The distance to the border, km *:

-the nearest locality

 

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

420

-Ekaterinburg,

210

-Moscow

1800

8.

Distance to railway station, km *

1

9.

Distance to the highway, km *

0.3

10.

Distance to the nearest airport, km *

28

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes, Idgc Of Urals

-power, Mw *

4

-distance to the point of connection, km *

-

11.2.

 

 

The presence of gas networks:

Yes, Oao Novatek

-power, thousand cubic meters *

86.655

-distance to connect, km *

-

11.3.

The presence of water distribution networks:

Yes, CBM POVV

-capacity, m3/hour *

4

-distance to connect, km *

-

11.4.

Sewerage networks:

Yes, CBM POVV

-capacity, m3/hour *

4

-distance to the point of (accession) connections, km *

-

11.5

The existence of networks of heat supply:

-

 

-power, KWT *

-

 

-distance to connect, km *

-

12.

Champion:

 

Director of FOREIGN TRADE DEPARTMENT

Gurevich Anton Dmytrovych,

Tel. 8-909-090-56-58,

e-mail: gurevitch-ad@chzto74.ru

FSUE Plant "Pribor"

1.

Location of the plot

Chelyabinsk,

Komsomolsky Ave. 29

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1924075, 61.3594701, Dornier Flugzeugwerke company under

2.

Cadastral numbers,

including (on):

-administrative building-1;

-administrative building-2;

-administrative building-3;

-industrial building-2;

-mechanical chassis

 

 

74:36:07.10.003:0019:032607:1000/A3a3

74:36:07.10.003:0019:032607:1000/A4a4

74:36:07.10.003:0019:032607:1000/A5

74:36:07.10.003:0019:032607:1000/A6a6

74:36:07.10.003:0019:032607:1000/A7a7

3.

Form of ownership

Federal

4.

Potential use of plot

Manufacturing, administrative, storage, domestic

5.

The proposed use (rent, sale)

 

Rent

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

-

6.2.

Free real estate (buildings), total 14935.3 m2. m,

including (on giving the technical specifications of the building):

-administrative building-1;

-administrative building-2;

-administrative building-3;

-industrial building-2;

-mechanical chassis

 

 

 

 

585.5

209.7

1391.2

7500.6

5248.3

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

390

-Ekaterinburg,

196

-Moscow

1783

8.

Distance to railway station, km *

7

9.

Distance to the highway, km *

0.05

10.

Distance to the nearest airport, km *

20

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes

-power, Mw *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

200

200

200

600

400

-distance to the point of connection, km *

-

11.2.

The presence of gas networks:

No

-capacity, m3/hour *

-

-distance to the point of connection, km *

-


11.3.

 

 

 

 

 

 

 

 

The presence of water distribution networks:

Yes

-capacity, m3/hour *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

250

300

250

300

300

-distance to connect, km *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

25

25

30

30

35

-free power cube. m/h,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

100

150

100

100

100

11.4.

Sewerage networks:

Yes

-capacity, m3/hour*,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

300

400

200

350

350

-distance to the point of (accession) connections, km *,

including (on):

1) administrative building-1;

2) administrative building-2;

3) administrative building-3;

4) manufacturing facility-2;

5) mechanical chassis

 

 

 

25

25

30

30

35

11.5

The existence of networks of heat supply:

-

 

-power, KWT *

-

 

-distance to connect, km *

-

12.

Champion:

 

Zam. Chief Engineer 
Shamin Mikhail Sergeevich, 
Tel. (8-351) 741-83-02,

+7 -951 -775 -60 -30,

email: pribor@priborplant.ru

JSC Chelyabinsk automechanical plant "

1.

Location of the plot

Chelyabinsk,

str. Christmas, 13

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1554496, 61.4447463, Dornier Flugzeugwerke company under

2.

Cadastral number (on):

-manufacturing building # 2

(the letters "b-1);

-covered parking (span diesel valves) (the letters "b-2");

-truck Depot

 

74:36:00.00.00:040596:1000/B1

 

74:36:02.11.002:0017:040596:

1000/B2

74:36:00.00.00.00.040596:1000H

3.

Form of ownership

Private

4.

Potential use of plot

Administrative, warehouse

5.

The proposed use (rent, sale)

Rent, sale, joint activities

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

-

6.2.

Free real estate (buildings), total 11033 sq ft *,

including (on giving the technical specifications of the building):

-manufacturing building # 2 (letter b-1);

-covered parking (span diesel valves) (the letters "b-2");

-truck Depot

 

 

 

 

8000

 

2380

 

653

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

417

-Ekaterinburg,

200

-Moscow

1770

8.

Distance to railway station, km *

6

9.

Distance to the highway, km *

-

10.

Distance to the nearest airport, km *

20

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks

Yes, a private substation

-power, Mw *

18.4

-distance to the point of connection, km *

3.4


11.2.

 

 

 

 

 

The presence of gas networks:

 

Yes. Gas boiler house for their own needs (heating)

-capacity, m3/hour *

-

-distance to connect, km *

-

11.3.

The presence of water distribution networks:

Yes

-capacity, m3/hour *

6.25

-distance to connect, km *

0.25

11.4.

Sewerage networks:

Yes

-capacity, m3/hour *

6.25

-distance to the point of (accession) connections, km *

0.1

11.5

The existence of networks of heat supply:

-

 

-power, KWT *

-

 

-distance to connect, km *

-

12.

Champion

 

The Deputy Head of the Legal Department 
Glushkov, Tatyana Vasilevna

Tel. (8-351) 775-01-93,

email: chamz@chel.surnet.ru

Technopark Traktorozavodskij»

Industrial Park "Technics"

I. the portion of the EI part of warehouse when the UCS base SFM, CPF

1.

Location of the plot

Chelyabinsk, Lenina Ave., 3

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1545025, 61.4848828, 483m/data =! 3m1! 1e3https://www.google.ru/maps/@ 55.1571339, 61.4735901, 485m/data =! 3m1! 1e3

2.

Cadastral numbers, (on):

Press and welding-hull;

 

74:36:0211002:198,

-machine-Assembly building No. 1

74:36:0211002:192

-warehouse building in the UCS

74:36:0211003:241

-non-residential premises no. 1-part "building (workshop block cutting tool)"

74:36:0211003:258

-non-residential building (Woodshop with ABK)

74:36:0211003:107

3.

Form of ownership

Private

4.

Potential use of plot

Manufacturing, administrative, domestic

5.

The proposed use (rent, sale)

Rent, sale

6.

Total area, HA *

including:

214

6.1

Vacant land for industrial purposes, *

5.86

6.2.

Free real estate (buildings), total 313 361 sq ft *,

 

including (on):

Press and welding-hull;

141 205 sq.m. (it is possible to rent the space from 30000 to 50000 sq.m., hsr = 17.25 m; hoisting: bridge cranes with capacities from 1 up to 30 tons)

-machine-Assembly building No. 1

130 797 (possible to rent space from 30000 to 50000 sq.m., h > 10 m; hoisting: bridge cranes with capacities from 1 up to 15 tons)

-warehouse building in the UCS

7 946

-non-residential premises no. 1-part "building (workshop block cutting tool)"

21 859

-non-residential building (Woodshop with ABK)

11 554

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-UFA,

-

250

-Ekaterinburg,

180

-Moscow

1500

8.

Distance to railway station, km *

0

9.

Distance to the highway, km *

Close proximity

10.

Distance to the nearest airport, km *

17.5

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes

-power, Mw *

176

-distance to the point of connection,km *

Up to 1

-free power Mw

81

11.2.

The presence of gas networks:

City gas network

-capacity, m3/hour *

16 200

-distance to connect, km *

From 100 m up to 1 km, depending on the consumer

-free power cube. m/h

8000

11.3.

The presence of water distribution networks:

A fire drinking and industrial water

-capacity, m3/hour *

300

-distance to connect, km *

From 1 m to 100 m

-free power cube. m/h

160

11.4.

Sewerage networks:

Yes, prom. Storm and sewer flow

-capacity, m3/hour *

300

-distance to the point of (accession) connections, km *

From 100 to 500-prom. storm sewer;

from 50 to 200-flow drain

11.5

The existence of networks of heat supply:

Local heat supply

 

-power, KWT *

 

 

-distance to connect, km *

 


12.

Champion

 

The Chief of Department of development and investment Krivonosov, Alexey Vadimovich

Tel. (8-351) 778-47-97,

8-932-110-0000-08,

e-mail: krivonosov72 @ gmail. com

II. Chelyabinsk plant of tractor transmissions

1.

Location of the plot

Chelyabinsk,

Sverdlovsky Trakt, 38

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.1992362, 61.3826187, 562m/data =! 3m1! 1e3

2.

Cadastral numbers, (on):

 

74:36:0706003:83; 74:36:0706003:1009; 74:36:0706003:111; 74:36:0706003:56; 74:36:0706003:54; 74:36:0706003:78; 74:36:0706003:55

3.

Form of ownership

Private

4.

Potential use of plot

Production

5.

The proposed use (rent, sale)

Rent, sale

6.

Total area, HA *

including:

-

6.1

Vacant land for industrial purposes, *

-

6.2.

Free real estate (buildings), total 61459.5 sq ft *

including (on):

Non-residential premises # 2

 

 

Non-residential building (manufacturing building # 1)

 

 

 

 

Non-residential building (industrial building No. 3)

 

 

Non-residential building-built compressor

 

 

Non-residential building (building # 2)

 

 

 

Non-residential building is built (addition to CEC)

 

 

 

Non-residential building (store BBHO)

 

 

The building (warehouse paints CSF)

 

 

Non-residential building (item accounting for drinking water)

 

Non-residential building (finished products)

 

Non-residential building-outpost

 

Non-residential building (boiler room)

 

Non-residential building-warehouse rack

 

 

Non-residential building (building offices on the territory of the garage)

 

Non-residential building (built motor shop

 

Non-residential building is built (garage)

 

Non-residential building (building vulcanization)

 

Non-residential building (building welding shops)

 

Non-residential building (para. washing and sanitizing of cars)

 

Non-residential premises no. 1

 

Non-residential building-entrance of Office

 

Non-residential building (watch)

 

Non-residential building (warehouse-garage)

 

Non-residential building (dining at the industrial site)

 

Non-residential building (warehouse)

 

Construction (condensate pumping station)

 

Non-residential building (warehouse pol)

 

Non-residential building (substation No. 9 (RP-1))

 

Non-residential building (substation No. 48 (RP-2))

 

Non-residential building (substation No. 63 (SGP))

 

Construction (sewage pumping station)

 

Non-residential premises # 2 (1000002379)

 

 

 

2821.2 kV. m, 4 gates, height 10 m, crane 5 t and 3T-2 PCs., 1T-1 PCs.

 

40646.8 kV. m, 4 gates, height 13 m, lifting mechanisms: overhead travelling cranes 5-12 t-8 pieces, crane 5 t-12 PCs. 1 k-2 PCs., 0.5 t-2 PCs., 0.25 t-3 PCs

 

7968 sq.ft. m, 2 gates, the height of 13.5 m, overhead cranes 5T-6 PCs., 10 t-3 PCs.

 

1076.1 sq.ft. m, 2 gates, 7 m height crane-beam 1 t-1 PCs., crane 0.5 t-2 PCs.

 

10032.5 kV. m, 2 gates, 8.3 m height, hoisting: 3T-6 PCs., monorail-0.5 t.

 

522.6 sq.ft. m, 3-storey building built, gates, floor height 3.7; 3.9 m, crane-beam 0.25 t, monorail-1 t.

 

36.9 sq. m, height 3.5 m gates.

 

 

19.8 sq.m. m. (metal frame, covered with metal sheets)

 

5.5 sq m. m

 

 

1509.8 kV. m., 4 gates, 7.1 m height crane-beam k-3 PCs.

 

5.6 kV. m

 

909 sqm. m

 

975.1 square. m., 4 gates, height 6.9 m, crane-beam k-1 PCs.

 

297.6 sq.ft. m

 

 

230.6 sq.ft. m

 

 

2482.8 kV. m

 

 

103.7 q. m

 

 

537.6 sq.ft. m, 2-storey building

 

321.9 sq.ft. m

 

 

270 sq. m. m

 

53.8 sq. m

 

47.6 square. m

 

520.5 sq.ft. m

 

598.1 sq.ft. m, 2-storey building

 

 

33.8 square. m

 

40.2 sq. m

 

 

23.4 square. m

 

99.1 square. m

 

100.1 square. m

 

33 kV. m

 

30.4 square meters. m

 

881.1 sq.ft. m

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-UFA,

-

350

-Ekaterinburg,

180

-Moscow

1500

8.

Distance to railway station, km *

0.2

9.

Distance to the highway, km *

0.1

10.

Distance to the nearest airport, km *

13

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

Yes

 

 

 

 

 

 

 

 

 

 

-power, Mw *

0.25 (2 transformer)

1 (23 transformer)

-distance to the point of connection, km *

-

11.2.

The presence of gas networks:

Yes, laying-on air and ground, medium and low pressure pipeline diameter-57-237 mm, presence of EMG.

 

 

 

 

 

 

 

 

 

 

 

-capacity, m3/hour *

-

-distance connections, km *

-

11.3.

The presence of water distribution networks:

Yes

 

 

 

 

 

 

 

 

 

 

 

-capacity, m3/hour *

-

-distance to connect, km *

-

-free power cube. m/h

-

11.4.

Sewerage networks:

Yes

 

 

 

 

 

 

 

 

Yes

 

-capacity, m3/hour *

-

-distance to the point of (accession) connections, km *

-

11.5

The existence of networks of heat supply:

Yes

 

 

 

 

 

 

 

 

 

 

-power, KWT *

-

 

-distance to connect, km *

-


12.

Champion

 

The Chief of Department of development and investment Krivonosov, Alexey Vadimovich

Tel. (8-351) 778-47-97,

8-932-110-0000-08,

e-mail: krivonosov72 @ gmail. com

OAO "chelyabinski Municipals plant" Teplopribor "

1.

Location

plot

Chelyabinsk,

str. 2 Paveletskaya str. 36

1.1

Link to Google Maps

https://www.google.ru/maps/@ 55.2745578, 61.4000652, 625 m/

2.

Cadastral number

74.36.01.170020007

3.

Form of ownership

Private

4.

Potential use of plot

Manufacturing, administrative, warehouse

5.

The proposed use (rent, sale)

Rent

6.

Total area, HA *

including:

11

6.1

Vacant land for industrial purposes, *

 

0.5

6.2.

Free real estate (buildings), sq ft *,

including:

 

 

 

 

 

 

Business premises (building # 1)

From 18 up to 500 sq.m.

Office rooms from 18 sq m in the business center class "b".

High-quality finishing (renovation), State-of-the-art glass, efficient floor plan.

There are 2 guarded parking 300 parking spaces. Operates 24 h security, canteen, shop, 2 ATM. For the convenience of tenants set up convenient places for smoking, opposite one of the buildings there is a relaxation area-garden stones.

Around the perimeter of the CCTV system has been installed, the system of access control.

 

Production and warehouse (building # 1)

100 sq ft

Heated production and warehouse

General information:

1) ceiling height 4.2 m;

2) concrete Floor;

3) free power 40 kW with increasing tenant upon request up to 200 kW;

4) Artificial and natural light (plastic Windows with double glazing);

6) ability to connect telephone lines and the Internet;

7) Gates 3.5 * 3.2 m.

 

Industrial premises (building No. 3)

From 50 to 500 sq.m.

Heated industrial premises

General information:

1) ceiling height from 7.23 to 11.33 m;

2) Smooth concrete floors;

3) Gates 4.0 * 4.4 m;

4) free capacity up to 500 kW on request of the tenant.

 

 

Industrial premises under manufacture (No. 13)

From 50 to 150 sq.m.

Heated premises under manufacture

General information:

1) Room is located on the 1 floor;

2) concrete floors;

3) separate entrance;

4) Power 50 kW;

5) 2.95 m height;

6) communications: sewerage, water (c/c).

 

Production and warehouse (building No 4)

155 sqm

Heated industrial premises

General information:

1) ceiling height 5.5 m;

2) concrete floors;

3) electric wire rope hoist is installed indoors with load capacity 3T;

4) the height of the Gate 3.5 * 3, 5 m.

7.

The distance to the border, km *:

 

-the nearest locality

-

-the regional centre,

-

-Chelyabinsk,

-

-UFA,

433

-Ekaterinburg,

195

-Moscow

1772

8.

Distance to railway station, km *

On the territory of JSC "Chelyabinsk plant" Teplopribor "is a branch of the Southern-Ural railway station, the nearest station" Metallurgical "5 km

9.

Distance to the highway, km *

In the immediate vicinity

10.

Distance to the nearest airport, km *

13

11.

Availability of infrastructure:

 

11.1.

Availability of energy networks:

LAP cable from JSC "Grid" 6 kW in property

-power, KWT *

2335

-distance to the point of connection, km *

0.37

11.2.

 

 

The presence of gas networks:

Gas supply network of OAO NOVATEK

Overhead method of laying;

Trunk of the second category;

Distribution of low pressure;

diameter of 100;

No FRACTURING

-capacity, m3/hour *

920

-distance to connect, km *

Passes through land

11.3.

The presence of water distribution networks:

POVV CBM (Jv "Vodosbyt")

Appointment of water distribution networks: domestic, fire, industrial

Diameter 100

-capacity, m3/day *

301

-distance to connect, km *

Passes through land


11.4.

Sewerage networks:

POVV CBM (Jv "Vodosbyt")

Appointment: rozdilna

-capacity, m3/day *

301

-distance to the point of connection, km *

Passes through land

11.5

The existence of networks of heat supply:

Heat supply network in stock

 

-power, KWT *

3600

 

-distance to connect, km *

Passes through land

12.

Champion

 

Marketing specialist property management division

Popova Marina Valerievna,

Tel. (8-351) 725-75-77,

e-mail: arenda@tpchel.ru

*-units of physical quantities